ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

95

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,970k 553k
MMBtu
$6.25
- Electrical $1,062k 22,569k
kWh
$0.051
- Natural Gas $355k 119k
MMBtu
$5.44

662

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $207k 24k
MMBtu
4.3%
- Electrical $114k 2,344k
kWh
10.4%
- Natural Gas $31k -
MMBtu
-
Waste $0.8k
Productivity/Other $149k
TOTAL $357k
*May be negative reflecting an increased cost component required to save energy and costs overall

92

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,006k 568k
MMBtu
$6.00
- Electrical $1,085k 23,104k
kWh
$0.050
- Natural Gas $362k 122k
MMBtu
$5.56

271

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 7.8k
MMBtu
1.4%
- Electrical $38k 761k
kWh
3.3%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other $10k
TOTAL $81k