ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products

105

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,185k 266k
MMBtu
$6.90
- Electrical $734k 14,454k
kWh
$0.056
- Natural Gas $91k 15k
MMBtu
$2.53

714

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $200k 29k
MMBtu
11.1%
- Electrical $152k 2,865k
kWh
19.8%
- Natural Gas $4.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $121k
TOTAL $322k
*May be negative reflecting an increased cost component required to save energy and costs overall

100

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,161k 269k
MMBtu
$6.73
- Electrical $709k 14,290k
kWh
$0.055
- Natural Gas $92k 16k
MMBtu
$2.48

342

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 5.7k
MMBtu
2.1%
- Electrical $30k 556k
kWh
3.9%
- Natural Gas $0.3k -
MMBtu
-
Waste $0.1k
Productivity/Other $7.3k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall