ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products

107

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,189k 264k
MMBtu
$6.94
- Electrical $743k 14,466k
kWh
$0.056
- Natural Gas $90k 15k
MMBtu
$2.53

722

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $197k 29k
MMBtu
10.9%
- Electrical $149k 2,815k
kWh
19.5%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.9k
Productivity/Other $119k
TOTAL $317k
*May be negative reflecting an increased cost component required to save energy and costs overall

104

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,182k 266k
MMBtu
$6.88
- Electrical $727k 14,418k
kWh
$0.056
- Natural Gas $92k 16k
MMBtu
$2.55

352

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 5.5k
MMBtu
2.1%
- Electrical $29k 536k
kWh
3.7%
- Natural Gas $0.3k -
MMBtu
-
Waste $0.1k
Productivity/Other $7.1k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall