ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

457

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,084k 248k
MMBtu
$8.01
- Electrical $612k 12,044k
kWh
$0.065
- Natural Gas $164k 40k
MMBtu
$4.51

3,208

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $137k 17k
MMBtu
6.8%
- Electrical $88k 1,655k
kWh
13.7%
- Natural Gas $14k -
MMBtu
-
Waste $1.3k
Productivity/Other $88k
TOTAL $226k
*May be negative reflecting an increased cost component required to save energy and costs overall

437

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,095k 256k
MMBtu
$7.85
- Electrical $615k 12,269k
kWh
$0.064
- Natural Gas $168k 41k
MMBtu
$4.49

1,459

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 5.4k
MMBtu
2.1%
- Electrical $30k 528k
kWh
4.3%
- Natural Gas $6.4k -
MMBtu
-
Waste $0.2k
Productivity/Other $12k
TOTAL $58k