ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

450

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,089k 251k
MMBtu
$7.91
- Electrical $616k 12,146k
kWh
$0.064
- Natural Gas $166k 40k
MMBtu
$4.53

3,173

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $139k 17k
MMBtu
6.8%
- Electrical $89k 1,677k
kWh
13.8%
- Natural Gas $14k -
MMBtu
-
Waste $1.3k
Productivity/Other $89k
TOTAL $229k
*May be negative reflecting an increased cost component required to save energy and costs overall

431

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,099k 258k
MMBtu
$7.80
- Electrical $613k 12,318k
kWh
$0.063
- Natural Gas $170k 41k
MMBtu
$4.48

1,445

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 5.5k
MMBtu
2.1%
- Electrical $30k 532k
kWh
4.3%
- Natural Gas $6.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $12k
TOTAL $59k