ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Leather and allied product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $297k 28k
MMBtu
$11.27
- Electrical $128k 1,824k
kWh
$0.068
- Natural Gas $61k 7.4k
MMBtu
$3.46

64

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 1.5k
MMBtu
5.4%
- Electrical $10k 145k
kWh
8.0%
- Natural Gas $13k -
MMBtu
-
Waste $3.7k
Productivity/Other $5.7k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $327k 31k
MMBtu
$11.08
- Electrical $139k 1,979k
kWh
$0.069
- Natural Gas $76k 9.2k
MMBtu
$4.32

18

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.5k 0.2k
MMBtu
0.6%
- Electrical $1.9k 19k
kWh
1.0%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $4.6k