ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Apparel accessories and other apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $473k 62k
MMBtu
$9.02
- Electrical $246k 4,582k
kWh
$0.056
- Natural Gas $85k 15k
MMBtu
$8.60

34

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.5k
MMBtu
7.2%
- Electrical $29k 435k
kWh
9.5%
- Natural Gas $9.4k -
MMBtu
-
Waste $1.3k
Productivity/Other $2.1k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $566k 76k
MMBtu
$8.36
- Electrical $300k 5,541k
kWh
$0.061
- Natural Gas $104k 19k
MMBtu
$7.69

5

Implemented Recommendations

1.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 0.9k
MMBtu
1.2%
- Electrical $4.3k 87k
kWh
1.6%
- Natural Gas $7.9k -
MMBtu
-
Waste $0.5k
Productivity/Other -
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall