ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cut and sew apparel contractors
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $213k 26k
MMBtu
$9.69
- Electrical $103k 1,576k
kWh
$0.079
- Natural Gas $58k 10.0k
MMBtu
$6.62

100

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.3k
MMBtu
16.2%
- Electrical $27k 419k
kWh
26.6%
- Natural Gas $12k -
MMBtu
-
Waste $0.3k
Productivity/Other $4.3k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $213k 26k
MMBtu
$9.69
- Electrical $103k 1,576k
kWh
$0.079
- Natural Gas $58k 10.0k
MMBtu
$6.62

53

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 0.8k
MMBtu
3.0%
- Electrical $5.7k 78k
kWh
5.0%
- Natural Gas $5.9k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.4k
TOTAL $15k
*May be negative reflecting an increased cost component required to save energy and costs overall