ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cut and sew apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $233k 27k
MMBtu
$9.90
- Electrical $106k 1,808k
kWh
$0.075
- Natural Gas $48k 7.3k
MMBtu
$7.15

231

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.3k
MMBtu
16.0%
- Electrical $24k 422k
kWh
23.3%
- Natural Gas $12k -
MMBtu
-
Waste $0.8k
Productivity/Other $4.3k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $233k 27k
MMBtu
$9.90
- Electrical $106k 1,808k
kWh
$0.075
- Natural Gas $48k 7.3k
MMBtu
$7.15

103

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.1k
MMBtu
4.2%
- Electrical $8.5k 110k
kWh
6.1%
- Natural Gas $4.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.1k
TOTAL $18k