ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cut and sew apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $234k 27k
MMBtu
$9.73
- Electrical $109k 1,833k
kWh
$0.076
- Natural Gas $49k 7.5k
MMBtu
$7.07

226

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.1k
MMBtu
15.1%
- Electrical $24k 403k
kWh
22.0%
- Natural Gas $12k -
MMBtu
-
Waste $0.9k
Productivity/Other $4.5k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $234k 27k
MMBtu
$9.73
- Electrical $109k 1,833k
kWh
$0.076
- Natural Gas $49k 7.5k
MMBtu
$7.07

103

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.2k
MMBtu
4.3%
- Electrical $8.8k 114k
kWh
6.2%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.2k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall