The ITAC Statistics page displays the average assessment results for the selected criteria.
10
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $782k | 117k |
MMBtu
|
$6.75 |
- Electrical | $374k | 8,417k |
kWh
|
$0.043 |
- Natural Gas | $192k | 29k |
MMBtu
|
$6.19 |
81
Recommendations
8.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $56k | 4.0k |
MMBtu
|
3.4% |
- Electrical | $19k | 392k |
kWh
|
4.7% |
- Natural Gas | $26k | - |
MMBtu
|
- |
Waste | $0.4k | |||
Productivity/Other | $2.3k | |||
TOTAL | $59k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
10
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $782k | 117k |
MMBtu
|
$6.75 |
- Electrical | $374k | 8,417k |
kWh
|
$0.043 |
- Natural Gas | $192k | 29k |
MMBtu
|
$6.19 |
50
Implemented Recommendations
5.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $31k | 2.2k |
MMBtu
|
1.9% |
- Electrical | $11k | 216k |
kWh
|
2.6% |
- Natural Gas | $15k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $2.5k | |||
TOTAL | $33k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |