ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rope, cordage, twine, tire cord, and tire fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $984k 121k
MMBtu
$8.38
- Electrical $720k 9,270k
kWh
$0.081
- Natural Gas $218k 26k
MMBtu
$8.24

56

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 8.2k
MMBtu
6.8%
- Electrical $59k 796k
kWh
8.6%
- Natural Gas $37k -
MMBtu
-
Waste $0.1k
Productivity/Other $19k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,118k 137k
MMBtu
$8.36
- Electrical $810k 10,469k
kWh
$0.080
- Natural Gas $254k 30k
MMBtu
$9.61

27

Implemented Recommendations

4.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.3k
MMBtu
3.1%
- Electrical $36k 419k
kWh
4.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $5.0k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall