ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $704k 267k
MMBtu
$8.29
- Electrical $460k 8,722k
kWh
$0.074
- Natural Gas $134k 176k
MMBtu
$6.94

210

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 6.7k
MMBtu
2.5%
- Electrical $42k 655k
kWh
7.5%
- Natural Gas $13k -
MMBtu
-
Waste $0.6k
Productivity/Other $12k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $721k 275k
MMBtu
$8.28
- Electrical $470k 8,944k
kWh
$0.073
- Natural Gas $139k 182k
MMBtu
$7.17

106

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.8k
MMBtu
1.0%
- Electrical $19k 269k
kWh
3.0%
- Natural Gas $0.5k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall