ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Combustion of waste products
NAICS Curtain and linen mills
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $320k 39k
MMBtu
$8.27
- Electrical $197k 2,876k
kWh
$1.39
- Natural Gas $76k 9.1k
MMBtu
$9.61

79

Recommendations

9.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 7.9k
MMBtu
20.6%
- Electrical $46k 774k
kWh
26.9%
- Natural Gas $3.5k -
MMBtu
-
Waste -
Productivity/Other $26k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $320k 39k
MMBtu
$8.27
- Electrical $197k 2,876k
kWh
$1.39
- Natural Gas $76k 9.1k
MMBtu
$9.61

38

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 5.0k
MMBtu
13.0%
- Electrical $27k 490k
kWh
17.1%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall