ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Curtain and linen mills
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $320k 39k
MMBtu
$8.27
- Electrical $197k 2,876k
kWh
$1.39
- Natural Gas $76k 9.1k
MMBtu
$9.61

79

Recommendations

9.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 7.9k
MMBtu
20.6%
- Electrical $46k 774k
kWh
26.9%
- Natural Gas $3.5k -
MMBtu
-
Waste -
Productivity/Other $26k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $320k 39k
MMBtu
$8.27
- Electrical $197k 2,876k
kWh
$1.39
- Natural Gas $76k 9.1k
MMBtu
$9.61

38

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 5.0k
MMBtu
13.0%
- Electrical $27k 490k
kWh
17.1%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall