ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile furnishings mills
SIC 2+ Digits Required
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,334k 250k
MMBtu
$7.98
- Electrical $501k 15,643k
kWh
$0.35
- Natural Gas $552k 74k
MMBtu
$7.80

304

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $155k 13k
MMBtu
5.0%
- Electrical $71k 1,225k
kWh
7.8%
- Natural Gas $61k -
MMBtu
-
Waste $5.6k
Productivity/Other $7.0k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

30

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,421k 280k
MMBtu
$7.52
- Electrical $477k 17,328k
kWh
$0.41
- Natural Gas $636k 84k
MMBtu
$7.84

117

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 6.0k
MMBtu
2.1%
- Electrical $29k 582k
kWh
3.4%
- Natural Gas $11k -
MMBtu
-
Waste $0.0k
Productivity/Other $4.6k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall