ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products

77

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $961k 230k
MMBtu
$8.60
- Electrical $445k 11,257k
kWh
$0.21
- Natural Gas $326k 107k
MMBtu
$7.67

583

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 9.3k
MMBtu
4.0%
- Electrical $57k 903k
kWh
8.0%
- Natural Gas $35k -
MMBtu
-
Waste $2.9k
Productivity/Other $8.5k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

68

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $969k 247k
MMBtu
$8.28
- Electrical $429k 11,761k
kWh
$0.22
- Natural Gas $346k 118k
MMBtu
$7.53

240

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 4.0k
MMBtu
1.6%
- Electrical $22k 390k
kWh
3.3%
- Natural Gas $5.2k -
MMBtu
-
Waste $0.0k
Productivity/Other $2.7k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall