ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products

74

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $979k 238k
MMBtu
$8.38
- Electrical $451k 11,594k
kWh
$0.21
- Natural Gas $336k 111k
MMBtu
$7.53

558

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 9.4k
MMBtu
3.9%
- Electrical $55k 914k
kWh
7.9%
- Natural Gas $37k -
MMBtu
-
Waste $3.1k
Productivity/Other $8.8k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

66

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $990k 254k
MMBtu
$8.04
- Electrical $441k 12,079k
kWh
$0.23
- Natural Gas $355k 121k
MMBtu
$7.24

237

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 4.1k
MMBtu
1.6%
- Electrical $23k 401k
kWh
3.3%
- Natural Gas $5.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $2.5k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall