The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 313320 Fabric coating mills

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $731k 109k
MMBtu
$8.25
- Electrical $246k 5,711k
kWh
$0.069
- Natural Gas $374k 50k
MMBtu
$7.95

114

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 5.0k
MMBtu
4.5%
- Electrical $27k 483k
kWh
8.5%
- Natural Gas $78k -
MMBtu
-
Waste $0.5k
Productivity/Other $14k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $759k 114k
MMBtu
$7.99
- Electrical $251k 5,964k
kWh
$0.066
- Natural Gas $391k 53k
MMBtu
$7.53

36

Implemented Recommendations

2.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.4k
MMBtu
1.2%
- Electrical $7.5k 133k
kWh
2.2%
- Natural Gas $3.8k -
MMBtu
-
Waste $0.3k
Productivity/Other $2.4k
TOTAL $15k