ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $759k 114k
MMBtu
$7.99
- Electrical $251k 5,964k
kWh
$0.066
- Natural Gas $391k 53k
MMBtu
$7.53

106

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 4.9k
MMBtu
4.3%
- Electrical $24k 476k
kWh
8.0%
- Natural Gas $81k -
MMBtu
-
Waste $0.6k
Productivity/Other $15k
TOTAL $124k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $743k 113k
MMBtu
$8.03
- Electrical $248k 5,969k
kWh
$0.067
- Natural Gas $388k 51k
MMBtu
$7.66

35

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.4k
MMBtu
1.3%
- Electrical $7.9k 140k
kWh
2.3%
- Natural Gas $4.1k -
MMBtu
-
Waste $0.3k
Productivity/Other $2.6k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall