The ITAC Statistics page displays the average assessment results for the selected criteria.
18
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $731k | 109k |
MMBtu
|
$8.25 |
- Electrical | $246k | 5,711k |
kWh
|
$0.069 |
- Natural Gas | $374k | 50k |
MMBtu
|
$7.95 |
114
Recommendations
6.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $108k | 5.0k |
MMBtu
|
4.5% |
- Electrical | $27k | 483k |
kWh
|
8.5% |
- Natural Gas | $78k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $14k | |||
TOTAL | $123k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
18
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $731k | 109k |
MMBtu
|
$8.25 |
- Electrical | $246k | 5,711k |
kWh
|
$0.069 |
- Natural Gas | $374k | 50k |
MMBtu
|
$7.95 |
40
Implemented Recommendations
2.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $13k | 1.3k |
MMBtu
|
1.2% |
- Electrical | $7.7k | 131k |
kWh
|
2.3% |
- Natural Gas | $3.6k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $2.3k | |||
TOTAL | $15k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |