ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile and fabric finishing mills
SIC 2+ Digits Required
3+ Characters Required for Products

36

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,061k 162k
MMBtu
$8.27
- Electrical $429k 7,984k
kWh
$0.069
- Natural Gas $472k 79k
MMBtu
$14.91

273

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 6.8k
MMBtu
4.2%
- Electrical $53k 665k
kWh
8.3%
- Natural Gas $36k -
MMBtu
-
Waste $16k
Productivity/Other $16k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

31

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,093k 165k
MMBtu
$8.31
- Electrical $449k 8,258k
kWh
$0.066
- Natural Gas $482k 78k
MMBtu
$16.34

117

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.4k
MMBtu
1.4%
- Electrical $13k 233k
kWh
2.8%
- Natural Gas $13k -
MMBtu
-
Waste $11k
Productivity/Other $5.7k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall