The ITAC Statistics page displays the average assessment results for the selected criteria.
51
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $976k | 147k |
MMBtu
|
$8.11 |
- Electrical | $379k | 7,501k |
kWh
|
$0.065 |
- Natural Gas | $447k | 69k |
MMBtu
|
$12.79 |
362
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $102k | 6.3k |
MMBtu
|
4.3% |
- Electrical | $43k | 615k |
kWh
|
8.2% |
- Natural Gas | $50k | - |
MMBtu
|
- |
Waste | $12k | |||
Productivity/Other | $17k | |||
TOTAL | $130k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
45
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $999k | 151k |
MMBtu
|
$8.12 |
- Electrical | $391k | 7,754k |
kWh
|
$0.064 |
- Natural Gas | $462k | 70k |
MMBtu
|
$13.67 |
138
Implemented Recommendations
3.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $25k | 2.1k |
MMBtu
|
1.4% |
- Electrical | $11k | 207k |
kWh
|
2.7% |
- Natural Gas | $8.6k | - |
MMBtu
|
- |
Waste | $7.9k | |||
Productivity/Other | $4.8k | |||
TOTAL | $38k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |