ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Knit fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $706k 109k
MMBtu
$8.77
- Electrical $285k 6,393k
kWh
$0.060
- Natural Gas $111k 27k
MMBtu
$1.38

19

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 2.4k
MMBtu
2.2%
- Electrical ($-0.2)k 232k
kWh
3.6%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $0.5k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $791k 139k
MMBtu
$5.69
- Electrical $252k 9,045k
kWh
$0.028
- Natural Gas -
-
MMBtu
-

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 3.7k
MMBtu
2.7%
- Electrical $9.4k 360k
kWh
4.0%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall