ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Nonwoven fabric mills
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,202k 154k
MMBtu
$8.67
- Electrical $708k 12,327k
kWh
$0.066
- Natural Gas $199k 23k
MMBtu
$5.34

96

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 15k
MMBtu
9.7%
- Electrical $87k 1,453k
kWh
11.8%
- Natural Gas $9.5k -
MMBtu
-
Waste -
Productivity/Other $6.2k
TOTAL $138k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,227k 155k
MMBtu
$8.93
- Electrical $751k 12,563k
kWh
$0.071
- Natural Gas $207k 23k
MMBtu
$5.71

38

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 1.7k
MMBtu
1.1%
- Electrical $11k 163k
kWh
1.3%
- Natural Gas $16k -
MMBtu
-
Waste -
Productivity/Other $2.2k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall