ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Narrow fabric mills and schiffli machine embroidery
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $697k 95k
MMBtu
$10.05
- Electrical $250k 4,405k
kWh
$0.072
- Natural Gas $248k 39k
MMBtu
$7.39

58

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 2.7k
MMBtu
2.9%
- Electrical $16k 265k
kWh
6.0%
- Natural Gas $13k -
MMBtu
-
Waste -
Productivity/Other $33k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $697k 95k
MMBtu
$10.05
- Electrical $250k 4,405k
kWh
$0.072
- Natural Gas $248k 39k
MMBtu
$7.39

19

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 0.7k
MMBtu
0.7%
- Electrical $4.7k 68k
kWh
1.5%
- Natural Gas ($-2.2)k -
MMBtu
-
Waste -
Productivity/Other $6.1k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall