ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile mills
SIC 2+ Digits Required
3+ Characters Required for Products

132

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,324k 223k
MMBtu
$7.70
- Electrical $735k 15,406k
kWh
$0.061
- Natural Gas $336k 53k
MMBtu
$7.98

987

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 12k
MMBtu
5.2%
- Electrical $64k 1,131k
kWh
7.3%
- Natural Gas $41k -
MMBtu
-
Waste $5.4k
Productivity/Other $13k
TOTAL $152k
*May be negative reflecting an increased cost component required to save energy and costs overall

121

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,344k 229k
MMBtu
$7.48
- Electrical $744k 15,917k
kWh
$0.059
- Natural Gas $344k 54k
MMBtu
$8.15

438

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.4k
MMBtu
1.9%
- Electrical $22k 430k
kWh
2.7%
- Natural Gas $14k -
MMBtu
-
Waste $3.0k
Productivity/Other $4.2k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall