ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile mills
SIC 2+ Digits Required
3+ Characters Required for Products

129

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,312k 222k
MMBtu
$7.68
- Electrical $722k 15,379k
kWh
$0.060
- Natural Gas $335k 53k
MMBtu
$7.98

966

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 11k
MMBtu
5.0%
- Electrical $60k 1,092k
kWh
7.1%
- Natural Gas $40k -
MMBtu
-
Waste $5.5k
Productivity/Other $13k
TOTAL $149k
*May be negative reflecting an increased cost component required to save energy and costs overall

119

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,353k 231k
MMBtu
$7.49
- Electrical $752k 16,117k
kWh
$0.058
- Natural Gas $344k 53k
MMBtu
$8.21

423

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.5k
MMBtu
1.9%
- Electrical $22k 436k
kWh
2.7%
- Natural Gas $14k -
MMBtu
-
Waste $3.0k
Productivity/Other $4.3k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall