ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Textile mills
SIC 2+ Digits Required
3+ Characters Required for Products

136

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,307k 219k
MMBtu
$7.77
- Electrical $728k 15,159k
kWh
$0.062
- Natural Gas $329k 52k
MMBtu
$7.92

1,024

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $137k 12k
MMBtu
5.5%
- Electrical $68k 1,174k
kWh
7.7%
- Natural Gas $40k -
MMBtu
-
Waste $5.2k
Productivity/Other $15k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

128

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,321k 222k
MMBtu
$7.78
- Electrical $739k 15,475k
kWh
$0.061
- Natural Gas $331k 52k
MMBtu
$8.10

460

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.3k
MMBtu
1.9%
- Electrical $22k 422k
kWh
2.7%
- Natural Gas $13k -
MMBtu
-
Waste $2.8k
Productivity/Other $4.4k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall