ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Tobacco manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,923k 434k
MMBtu
$8.86
- Electrical $1,332k 30,357k
kWh
$0.064
- Natural Gas $670k 111k
MMBtu
$5.18

140

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $321k 31k
MMBtu
7.2%
- Electrical $134k 3,045k
kWh
10.0%
- Natural Gas $104k -
MMBtu
-
Waste $6.2k
Productivity/Other $6.5k
TOTAL $334k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,923k 434k
MMBtu
$8.86
- Electrical $1,332k 30,357k
kWh
$0.064
- Natural Gas $670k 111k
MMBtu
$5.18

83

Implemented Recommendations

5.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 14k
MMBtu
3.2%
- Electrical $63k 1,370k
kWh
4.5%
- Natural Gas $5.8k -
MMBtu
-
Waste $6.2k
Productivity/Other $2.7k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall