ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Distilleries
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,283k 392k
MMBtu
$7.36
- Electrical $632k 10,332k
kWh
$0.065
- Natural Gas $574k 174k
MMBtu
$4.80

115

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $293k 22k
MMBtu
5.7%
- Electrical $96k 2,162k
kWh
20.9%
- Natural Gas ($-15.2)k -
MMBtu
-
Waste $51k
Productivity/Other ($-0.6)k
TOTAL $344k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,427k 315k
MMBtu
$7.04
- Electrical $413k 8,430k
kWh
$0.057
- Natural Gas $467k 125k
MMBtu
$5.34

39

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 2.4k
MMBtu
0.8%
- Electrical $13k 239k
kWh
2.8%
- Natural Gas $27k -
MMBtu
-
Waste $47k
Productivity/Other ($-1.0)k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall