ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wineries
SIC 2+ Digits Required
3+ Characters Required for Products

69

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $550k 46k
MMBtu
$16.87
- Electrical $332k 3,027k
kWh
$0.74
- Natural Gas $64k 14k
MMBtu
$7.33

520

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $123k 8.7k
MMBtu
18.9%
- Electrical $110k 845k
kWh
27.9%
- Natural Gas $4.7k -
MMBtu
-
Waste $9.7k
Productivity/Other $20k
TOTAL $153k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $452k 43k
MMBtu
$16.46
- Electrical $273k 2,711k
kWh
$0.83
- Natural Gas $64k 15k
MMBtu
$7.09

238

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 3.6k
MMBtu
8.3%
- Electrical $42k 351k
kWh
12.9%
- Natural Gas $2.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $5.5k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall