Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wineries
SIC 2+ Digits Required
3+ Characters Required for Products

61

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $448k 43k
MMBtu
$16.47
- Electrical $271k 2,685k
kWh
$0.82
- Natural Gas $63k 15k
MMBtu
$6.98

458

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 7.0k
MMBtu
16.3%
- Electrical $83k 681k
kWh
25.4%
- Natural Gas $4.8k -
MMBtu
-
Waste $4.0k
Productivity/Other $20k
TOTAL $119k
*May be negative reflecting an increased cost component required to save energy and costs overall

59

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $453k 44k
MMBtu
$16.25
- Electrical $273k 2,736k
kWh
$0.84
- Natural Gas $65k 15k
MMBtu
$6.89

234

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 3.6k
MMBtu
8.2%
- Electrical $42k 352k
kWh
12.9%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other $5.5k
TOTAL $54k