ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Breweries
SIC 2+ Digits Required
3+ Characters Required for Products

71

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $787k 101k
MMBtu
$11.15
- Electrical $302k 4,919k
kWh
$0.089
- Natural Gas $310k 50k
MMBtu
$7.01

509

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 10k
MMBtu
10.0%
- Electrical $74k 989k
kWh
20.1%
- Natural Gas $19k -
MMBtu
-
Waste $14k
Productivity/Other $83k
TOTAL $202k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $856k 112k
MMBtu
$10.38
- Electrical $326k 5,426k
kWh
$0.082
- Natural Gas $346k 55k
MMBtu
$7.04

188

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 1.7k
MMBtu
1.5%
- Electrical $14k 164k
kWh
3.0%
- Natural Gas $13k -
MMBtu
-
Waste $0.8k
Productivity/Other $67k
TOTAL $98k