ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ice manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $476k 51k
MMBtu
$9.09
- Electrical $375k 4,922k
kWh
$0.073
- Natural Gas $2.6k 0.5k
MMBtu
$0.97

31

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 12k
MMBtu
23.0%
- Electrical $77k 1,142k
kWh
23.2%
- Natural Gas $0.9k -
MMBtu
-
Waste $3.7k
Productivity/Other $30k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $476k 51k
MMBtu
$9.09
- Electrical $375k 4,922k
kWh
$0.073
- Natural Gas $2.6k 0.5k
MMBtu
$0.97

7

Implemented Recommendations

1.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.8k 0.3k
MMBtu
0.7%
- Electrical $2.7k 34k
kWh
0.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $2.8k
*May be negative reflecting an increased cost component required to save energy and costs overall