ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 312112 Bottled water manufacturing

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,531k 212k
MMBtu
$9.07
- Electrical $1,075k 18,705k
kWh
$0.064
- Natural Gas $95k 20k
MMBtu
$6.67

149

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $136k 16k
MMBtu
7.7%
- Electrical $98k 1,587k
kWh
8.5%
- Natural Gas $13k -
MMBtu
-
Waste $2.9k
Productivity/Other $247k
TOTAL $386k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,165k 160k
MMBtu
$9.03
- Electrical $852k 13,865k
kWh
$0.064
- Natural Gas $92k 18k
MMBtu
$6.09

57

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.8k
MMBtu
4.2%
- Electrical $48k 660k
kWh
4.8%
- Natural Gas $4.1k -
MMBtu
-
Waste $1.8k
Productivity/Other $4.4k
TOTAL $69k
*May be negative reflecting an increased cost component required to save energy and costs overall