ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soft drink manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

103

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,103k 147k
MMBtu
$7.91
- Electrical $650k 10,333k
kWh
$0.063
- Natural Gas $256k 41k
MMBtu
$6.49

812

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 13k
MMBtu
8.5%
- Electrical $82k 1,220k
kWh
11.8%
- Natural Gas $46k -
MMBtu
-
Waste $20k
Productivity/Other $42k
TOTAL $207k
*May be negative reflecting an increased cost component required to save energy and costs overall

95

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,052k 139k
MMBtu
$7.75
- Electrical $599k 9,479k
kWh
$0.062
- Natural Gas $261k 42k
MMBtu
$6.31

343

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.9k
MMBtu
2.8%
- Electrical $23k 383k
kWh
4.0%
- Natural Gas $5.8k -
MMBtu
-
Waste $1.9k
Productivity/Other $9.0k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall