ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soft drink and ice manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

133

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,145k 152k
MMBtu
$8.30
- Electrical $701k 11,250k
kWh
$0.064
- Natural Gas $226k 36k
MMBtu
$6.27

1,015

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $141k 13k
MMBtu
8.6%
- Electrical $84k 1,267k
kWh
11.3%
- Natural Gas $38k -
MMBtu
-
Waste $16k
Productivity/Other $73k
TOTAL $230k
*May be negative reflecting an increased cost component required to save energy and costs overall

124

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,118k 149k
MMBtu
$8.04
- Electrical $682k 10,967k
kWh
$0.063
- Natural Gas $223k 36k
MMBtu
$6.12

439

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.9k
MMBtu
3.3%
- Electrical $29k 475k
kWh
4.3%
- Natural Gas $8.5k -
MMBtu
-
Waste $10k
Productivity/Other $7.9k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall