ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soft drink and ice manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

129

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,140k 153k
MMBtu
$8.14
- Electrical $703k 11,380k
kWh
$0.064
- Natural Gas $219k 36k
MMBtu
$6.26

992

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 13k
MMBtu
8.5%
- Electrical $84k 1,273k
kWh
11.2%
- Natural Gas $38k -
MMBtu
-
Waste $16k
Productivity/Other $73k
TOTAL $231k
*May be negative reflecting an increased cost component required to save energy and costs overall

117

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,038k 138k
MMBtu
$7.99
- Electrical $623k 9,845k
kWh
$0.063
- Natural Gas $225k 37k
MMBtu
$6.00

407

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.1k
MMBtu
3.0%
- Electrical $25k 403k
kWh
4.1%
- Natural Gas $5.3k -
MMBtu
-
Waste $1.8k
Productivity/Other $7.9k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall