ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soft drink and ice manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

130

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,137k 152k
MMBtu
$8.21
- Electrical $699k 11,320k
kWh
$0.063
- Natural Gas $218k 36k
MMBtu
$6.21

1,000

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 13k
MMBtu
8.6%
- Electrical $84k 1,277k
kWh
11.3%
- Natural Gas $38k -
MMBtu
-
Waste $16k
Productivity/Other $73k
TOTAL $230k
*May be negative reflecting an increased cost component required to save energy and costs overall

119

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,043k 138k
MMBtu
$8.03
- Electrical $622k 9,828k
kWh
$0.063
- Natural Gas $227k 37k
MMBtu
$6.05

418

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.1k
MMBtu
3.0%
- Electrical $25k 398k
kWh
4.1%
- Natural Gas $8.7k -
MMBtu
-
Waste $10k
Productivity/Other $7.7k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall