ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Beverage manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

286

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $962k 127k
MMBtu
$10.88
- Electrical $502k 7,616k
kWh
$0.23
- Natural Gas $231k 42k
MMBtu
$6.69

2,138

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 11k
MMBtu
8.8%
- Electrical $82k 1,086k
kWh
14.3%
- Natural Gas $22k -
MMBtu
-
Waste $15k
Productivity/Other $62k
TOTAL $207k
*May be negative reflecting an increased cost component required to save energy and costs overall

264

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $899k 120k
MMBtu
$10.71
- Electrical $490k 7,525k
kWh
$0.24
- Natural Gas $217k 38k
MMBtu
$6.52

944

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 3.7k
MMBtu
3.1%
- Electrical $28k 361k
kWh
4.8%
- Natural Gas $8.8k -
MMBtu
-
Waste $6.7k
Productivity/Other $27k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall