ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Beverage manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

234

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $912k 127k
MMBtu
$10.17
- Electrical $469k 7,375k
kWh
$0.26
- Natural Gas $245k 46k
MMBtu
$6.33

1,765

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 11k
MMBtu
8.5%
- Electrical $73k 1,053k
kWh
14.3%
- Natural Gas $24k -
MMBtu
-
Waste $11k
Productivity/Other $64k
TOTAL $196k
*May be negative reflecting an increased cost component required to save energy and costs overall

230

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $889k 120k
MMBtu
$10.27
- Electrical $466k 7,212k
kWh
$0.26
- Natural Gas $232k 41k
MMBtu
$6.38

818

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.4k
MMBtu
2.9%
- Electrical $26k 336k
kWh
4.7%
- Natural Gas $7.5k -
MMBtu
-
Waste $3.2k
Productivity/Other $23k
TOTAL $66k