ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Miscellaneous
NAICS All other miscellaneous food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

71

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,117k 158k
MMBtu
$9.12
- Electrical $581k 9,355k
kWh
$0.070
- Natural Gas $293k 58k
MMBtu
$5.57

523

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $137k 13k
MMBtu
8.3%
- Electrical $89k 1,290k
kWh
13.8%
- Natural Gas $9.7k -
MMBtu
-
Waste $7.5k
Productivity/Other $34k
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $883k 127k
MMBtu
$9.41
- Electrical $444k 7,663k
kWh
$0.072
- Natural Gas $220k 44k
MMBtu
$5.80

219

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 6.0k
MMBtu
4.8%
- Electrical $36k 590k
kWh
7.7%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.9k
Productivity/Other $12k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall