ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Perishable prepared food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

27

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $909k 128k
MMBtu
$9.09
- Electrical $581k 9,078k
kWh
$0.072
- Natural Gas $184k 34k
MMBtu
$6.03

209

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 7.2k
MMBtu
5.6%
- Electrical $53k 698k
kWh
7.7%
- Natural Gas $26k -
MMBtu
-
Waste $0.6k
Productivity/Other $201k
TOTAL $295k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $919k 138k
MMBtu
$8.18
- Electrical $588k 9,606k
kWh
$0.067
- Natural Gas $206k 40k
MMBtu
$5.49

51

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.9k
MMBtu
1.4%
- Electrical $12k 190k
kWh
2.0%
- Natural Gas $9.3k -
MMBtu
-
Waste $0.6k
Productivity/Other $46k
TOTAL $69k
*May be negative reflecting an increased cost component required to save energy and costs overall