ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Perishable prepared food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $881k 123k
MMBtu
$9.21
- Electrical $565k 8,790k
kWh
$0.073
- Natural Gas $177k 33k
MMBtu
$5.82

212

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 6.9k
MMBtu
5.6%
- Electrical $51k 677k
kWh
7.7%
- Natural Gas $25k -
MMBtu
-
Waste $0.5k
Productivity/Other $194k
TOTAL $285k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $939k 132k
MMBtu
$8.85
- Electrical $604k 9,412k
kWh
$0.072
- Natural Gas $189k 36k
MMBtu
$5.40

60

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.2k
MMBtu
1.7%
- Electrical $14k 214k
kWh
2.3%
- Natural Gas $11k -
MMBtu
-
Waste $0.6k
Productivity/Other $41k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall