Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

111

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,138k 150k
MMBtu
$9.56
- Electrical $619k 9,618k
kWh
$0.073
- Natural Gas $243k 49k
MMBtu
$5.42

819

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $162k 13k
MMBtu
8.8%
- Electrical $94k 1,281k
kWh
13.3%
- Natural Gas $14k -
MMBtu
-
Waste $6.2k
Productivity/Other $72k
TOTAL $241k
*May be negative reflecting an increased cost component required to save energy and costs overall

101

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,118k 152k
MMBtu
$9.24
- Electrical $601k 9,521k
kWh
$0.071
- Natural Gas $255k 51k
MMBtu
$5.34

325

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.8k
MMBtu
3.8%
- Electrical $38k 567k
kWh
6.0%
- Natural Gas $9.8k -
MMBtu
-
Waste $1.7k
Productivity/Other $18k
TOTAL $76k