ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

107

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,121k 151k
MMBtu
$9.42
- Electrical $603k 9,530k
kWh
$0.072
- Natural Gas $252k 50k
MMBtu
$5.62

790

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 12k
MMBtu
8.0%
- Electrical $84k 1,174k
kWh
12.3%
- Natural Gas $14k -
MMBtu
-
Waste $6.6k
Productivity/Other $75k
TOTAL $212k
*May be negative reflecting an increased cost component required to save energy and costs overall

99

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,079k 150k
MMBtu
$9.12
- Electrical $582k 9,247k
kWh
$0.071
- Natural Gas $259k 52k
MMBtu
$5.41

312

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 5.5k
MMBtu
3.7%
- Electrical $35k 534k
kWh
5.8%
- Natural Gas $9.8k -
MMBtu
-
Waste $0.9k
Productivity/Other $19k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall