ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

100

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,062k 150k
MMBtu
$9.13
- Electrical $583k 9,274k
kWh
$0.071
- Natural Gas $260k 52k
MMBtu
$5.61

740

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $124k 11k
MMBtu
7.6%
- Electrical $78k 1,115k
kWh
12.0%
- Natural Gas $15k -
MMBtu
-
Waste $5.5k
Productivity/Other $78k
TOTAL $208k
*May be negative reflecting an increased cost component required to save energy and costs overall

90

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $999k 142k
MMBtu
$9.08
- Electrical $544k 8,772k
kWh
$0.071
- Natural Gas $255k 49k
MMBtu
$5.56

288

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 5.4k
MMBtu
3.8%
- Electrical $34k 527k
kWh
6.0%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.8k
Productivity/Other $21k
TOTAL $72k
*May be negative reflecting an increased cost component required to save energy and costs overall