The ITAC Statistics page displays the average assessment results for the selected criteria.
22
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $799k | 110k |
MMBtu
|
$9.35 |
- Electrical | $484k | 6,878k |
kWh
|
$0.092 |
- Natural Gas | $244k | 39k |
MMBtu
|
$6.26 |
147
Recommendations
6.7
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $71k | 6.2k |
MMBtu
|
5.6% |
- Electrical | $48k | 601k |
kWh
|
8.7% |
- Natural Gas | $19k | - |
MMBtu
|
- |
Waste | $0.5k | |||
Productivity/Other | $19k | |||
TOTAL | $91k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
20
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $838k | 117k |
MMBtu
|
$8.67 |
- Electrical | $513k | 7,419k |
kWh
|
$0.084 |
- Natural Gas | $252k | 40k |
MMBtu
|
$6.15 |
55
Implemented Recommendations
2.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $20k | 1.6k |
MMBtu
|
1.4% |
- Electrical | $10k | 155k |
kWh
|
2.1% |
- Natural Gas | $7.3k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $9.0k | |||
TOTAL | $29k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |