ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other snack food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

38

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,319k 205k
MMBtu
$7.75
- Electrical $447k 7,499k
kWh
$0.070
- Natural Gas $669k 125k
MMBtu
$6.05

280

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 6.6k
MMBtu
3.2%
- Electrical $63k 647k
kWh
8.6%
- Natural Gas $42k -
MMBtu
-
Waste $17k
Productivity/Other $24k
TOTAL $152k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,340k 218k
MMBtu
$7.18
- Electrical $457k 7,982k
kWh
$0.064
- Natural Gas $678k 132k
MMBtu
$5.66

115

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.4k
MMBtu
1.6%
- Electrical $27k 331k
kWh
4.1%
- Natural Gas $6.9k -
MMBtu
-
Waste $9.5k
Productivity/Other $7.7k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall