ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Snack food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

58

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,192k 179k
MMBtu
$8.24
- Electrical $505k 7,971k
kWh
$0.069
- Natural Gas $506k 92k
MMBtu
$5.42

446

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $122k 10k
MMBtu
5.8%
- Electrical $82k 1,011k
kWh
12.7%
- Natural Gas $26k -
MMBtu
-
Waste $12k
Productivity/Other $17k
TOTAL $151k
*May be negative reflecting an increased cost component required to save energy and costs overall

55

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,249k 188k
MMBtu
$8.12
- Electrical $530k 8,364k
kWh
$0.069
- Natural Gas $530k 97k
MMBtu
$5.43

211

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 4.5k
MMBtu
2.4%
- Electrical $39k 438k
kWh
5.2%
- Natural Gas $7.5k -
MMBtu
-
Waste $6.5k
Productivity/Other $5.3k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall