ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Snack food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

67

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,153k 165k
MMBtu
$8.73
- Electrical $484k 7,363k
kWh
$0.074
- Natural Gas $474k 85k
MMBtu
$5.49

522

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $133k 10k
MMBtu
6.2%
- Electrical $88k 1,005k
kWh
13.6%
- Natural Gas $29k -
MMBtu
-
Waste $11k
Productivity/Other $17k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,159k 174k
MMBtu
$8.35
- Electrical $491k 7,740k
kWh
$0.070
- Natural Gas $491k 89k
MMBtu
$5.52

223

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.2k
MMBtu
2.4%
- Electrical $36k 408k
kWh
5.3%
- Natural Gas $7.1k -
MMBtu
-
Waste $6.0k
Productivity/Other $4.9k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall