ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Snack food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

64

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,170k 169k
MMBtu
$8.60
- Electrical $486k 7,518k
kWh
$0.072
- Natural Gas $494k 87k
MMBtu
$5.59

493

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 10.0k
MMBtu
5.9%
- Electrical $83k 974k
kWh
13.0%
- Natural Gas $30k -
MMBtu
-
Waste $11k
Productivity/Other $17k
TOTAL $157k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,159k 174k
MMBtu
$8.35
- Electrical $491k 7,740k
kWh
$0.070
- Natural Gas $491k 89k
MMBtu
$5.52

223

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.2k
MMBtu
2.4%
- Electrical $36k 408k
kWh
5.3%
- Natural Gas $7.1k -
MMBtu
-
Waste $6.0k
Productivity/Other $4.9k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall