Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

259

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,038k 145k
MMBtu
$9.07
- Electrical $517k 8,159k
kWh
$0.074
- Natural Gas $319k 58k
MMBtu
$5.71

1,961

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 11k
MMBtu
7.5%
- Electrical $78k 1,062k
kWh
13.0%
- Natural Gas $22k -
MMBtu
-
Waste $8.1k
Productivity/Other $46k
TOTAL $175k
*May be negative reflecting an increased cost component required to save energy and costs overall

239

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,016k 146k
MMBtu
$8.77
- Electrical $506k 8,088k
kWh
$0.073
- Natural Gas $329k 61k
MMBtu
$5.64

825

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.4k
MMBtu
3.0%
- Electrical $30k 429k
kWh
5.3%
- Natural Gas $9.7k -
MMBtu
-
Waste $2.6k
Productivity/Other $16k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall