ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

236

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,012k 147k
MMBtu
$8.75
- Electrical $508k 8,149k
kWh
$0.072
- Natural Gas $331k 61k
MMBtu
$5.71

1,788

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 10k
MMBtu
7.0%
- Electrical $71k 1,001k
kWh
12.3%
- Natural Gas $21k -
MMBtu
-
Waste $7.2k
Productivity/Other $49k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

215

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $972k 143k
MMBtu
$8.60
- Electrical $478k 7,887k
kWh
$0.071
- Natural Gas $327k 60k
MMBtu
$5.78

760

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.3k
MMBtu
3.0%
- Electrical $28k 416k
kWh
5.3%
- Natural Gas $8.5k -
MMBtu
-
Waste $2.8k
Productivity/Other $17k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall