ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

240

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,009k 146k
MMBtu
$8.77
- Electrical $507k 8,104k
kWh
$0.073
- Natural Gas $329k 60k
MMBtu
$5.72

1,816

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 10k
MMBtu
7.0%
- Electrical $71k 993k
kWh
12.2%
- Natural Gas $22k -
MMBtu
-
Waste $7.1k
Productivity/Other $48k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

224

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,001k 146k
MMBtu
$8.65
- Electrical $499k 8,036k
kWh
$0.072
- Natural Gas $336k 61k
MMBtu
$5.65

788

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.4k
MMBtu
3.0%
- Electrical $30k 432k
kWh
5.4%
- Natural Gas $9.4k -
MMBtu
-
Waste $2.7k
Productivity/Other $17k
TOTAL $65k