ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

243

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,018k 145k
MMBtu
$8.85
- Electrical $507k 8,042k
kWh
$0.074
- Natural Gas $332k 60k
MMBtu
$5.73

1,842

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 10k
MMBtu
7.0%
- Electrical $72k 993k
kWh
12.3%
- Natural Gas $23k -
MMBtu
-
Waste $7.1k
Productivity/Other $47k
TOTAL $169k
*May be negative reflecting an increased cost component required to save energy and costs overall

230

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,030k 149k
MMBtu
$8.72
- Electrical $513k 8,231k
kWh
$0.072
- Natural Gas $336k 62k
MMBtu
$5.65

804

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.5k
MMBtu
3.0%
- Electrical $31k 442k
kWh
5.4%
- Natural Gas $9.3k -
MMBtu
-
Waste $2.7k
Productivity/Other $17k
TOTAL $66k