ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Tortilla manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $448k 58k
MMBtu
$8.73
- Electrical $193k 3,011k
kWh
$0.074
- Natural Gas $158k 27k
MMBtu
$6.55

109

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 5.4k
MMBtu
9.3%
- Electrical $39k 528k
kWh
17.5%
- Natural Gas $2.8k -
MMBtu
-
Waste $4.2k
Productivity/Other $8.7k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $458k 58k
MMBtu
$9.05
- Electrical $195k 3,011k
kWh
$0.076
- Natural Gas $166k 27k
MMBtu
$6.92

46

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.2k
MMBtu
3.9%
- Electrical $15k 217k
kWh
7.2%
- Natural Gas $1.9k -
MMBtu
-
Waste $0.4k
Productivity/Other $3.8k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall