ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 31182 Cookie, cracker, and pasta manufacturing

36

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $923k 137k
MMBtu
$8.85
- Electrical $390k 7,891k
kWh
$0.069
- Natural Gas $348k 56k
MMBtu
$7.88

274

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $115k 13k
MMBtu
9.1%
- Electrical $71k 1,223k
kWh
15.5%
- Natural Gas $37k -
MMBtu
-
Waste $2.1k
Productivity/Other $23k
TOTAL $140k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $971k 148k
MMBtu
$7.74
- Electrical $413k 8,547k
kWh
$0.060
- Natural Gas $364k 61k
MMBtu
$6.95

115

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.5k
MMBtu
1.7%
- Electrical $13k 241k
kWh
2.8%
- Natural Gas $17k -
MMBtu
-
Waste $1.8k
Productivity/Other $15k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall