The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 311813 Frozen cakes, pies, and other pastries manufacturing

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $941k 140k
MMBtu
$7.73
- Electrical $578k 11,008k
kWh
$0.048
- Natural Gas $153k 27k
MMBtu
$6.87

99

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $220k 22k
MMBtu
15.6%
- Electrical $137k 2,139k
kWh
19.4%
- Natural Gas $52k -
MMBtu
-
Waste $14k
Productivity/Other $5.5k
TOTAL $240k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $941k 140k
MMBtu
$7.73
- Electrical $578k 11,008k
kWh
$0.048
- Natural Gas $153k 27k
MMBtu
$6.87

36

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.2k
MMBtu
2.3%
- Electrical $20k 314k
kWh
2.9%
- Natural Gas $5.3k -
MMBtu
-
Waste -
Productivity/Other $3.6k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall