ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial bakeries
SIC 2+ Digits Required
3+ Characters Required for Products

135

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,017k 140k
MMBtu
$8.27
- Electrical $513k 8,176k
kWh
$0.067
- Natural Gas $342k 57k
MMBtu
$6.92

1,042

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 9.7k
MMBtu
6.9%
- Electrical $60k 945k
kWh
11.6%
- Natural Gas $21k -
MMBtu
-
Waste $4.1k
Productivity/Other $26k
TOTAL $131k
*May be negative reflecting an increased cost component required to save energy and costs overall

126

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,036k 144k
MMBtu
$7.93
- Electrical $528k 8,373k
kWh
$0.066
- Natural Gas $347k 58k
MMBtu
$6.75

462

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.8k
MMBtu
3.3%
- Electrical $29k 465k
kWh
5.6%
- Natural Gas $5.2k -
MMBtu
-
Waste $1.0k
Productivity/Other $17k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall