ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Retail bakeries
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,024k 125k
MMBtu
$9.04
- Electrical $467k 6,939k
kWh
$0.071
- Natural Gas $440k 54k
MMBtu
$8.49

51

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 3.3k
MMBtu
2.6%
- Electrical $24k 321k
kWh
4.6%
- Natural Gas $38k -
MMBtu
-
Waste $1.6k
Productivity/Other $2.3k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,135k 134k
MMBtu
$9.75
- Electrical $509k 7,366k
kWh
$0.075
- Natural Gas $494k 58k
MMBtu
$9.26

21

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.1k
MMBtu
1.6%
- Electrical $16k 203k
kWh
2.8%
- Natural Gas $6.1k -
MMBtu
-
Waste $1.9k
Productivity/Other $2.7k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall