The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 31181 Bread and bakery product manufacturing

153

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,010k 140k
MMBtu
$8.17
- Electrical $516k 8,323k
kWh
$0.066
- Natural Gas $333k 54k
MMBtu
$6.99

1,192

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 10k
MMBtu
7.3%
- Electrical $64k 1,002k
kWh
12.0%
- Natural Gas $24k -
MMBtu
-
Waste $4.7k
Productivity/Other $23k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

144

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,028k 142k
MMBtu
$8.13
- Electrical $528k 8,479k
kWh
$0.066
- Natural Gas $337k 55k
MMBtu
$6.95

521

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.5k
MMBtu
3.2%
- Electrical $28k 440k
kWh
5.2%
- Natural Gas $5.2k -
MMBtu
-
Waste $0.9k
Productivity/Other $16k
TOTAL $57k