ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Bakeries and tortilla manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

200

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $967k 135k
MMBtu
$8.40
- Electrical $475k 7,958k
kWh
$0.067
- Natural Gas $328k 53k
MMBtu
$7.18

1,558

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 10k
MMBtu
7.7%
- Electrical $64k 1,011k
kWh
12.7%
- Natural Gas $25k -
MMBtu
-
Waste $4.1k
Productivity/Other $23k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

186

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $987k 139k
MMBtu
$8.03
- Electrical $491k 8,190k
kWh
$0.065
- Natural Gas $333k 55k
MMBtu
$6.90

675

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.1k
MMBtu
2.9%
- Electrical $25k 395k
kWh
4.8%
- Natural Gas $7.0k -
MMBtu
-
Waste $1.1k
Productivity/Other $15k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall