ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Seafood product preparation and packaging
SIC 2+ Digits Required
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $707k 77k
MMBtu
$11.73
- Electrical $464k 5,567k
kWh
$0.10
- Natural Gas $101k 18k
MMBtu
$4.90

288

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 6.7k
MMBtu
8.7%
- Electrical $58k 653k
kWh
11.7%
- Natural Gas $8.1k -
MMBtu
-
Waste $23k
Productivity/Other $109k
TOTAL $219k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $716k 81k
MMBtu
$10.30
- Electrical $469k 5,845k
kWh
$0.091
- Natural Gas $106k 18k
MMBtu
$4.97

108

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 3.6k
MMBtu
4.4%
- Electrical $32k 348k
kWh
6.0%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.3k
Productivity/Other $45k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall