Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Seafood product preparation and packaging
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $699k 76k
MMBtu
$11.66
- Electrical $460k 5,527k
kWh
$0.10
- Natural Gas $99k 17k
MMBtu
$4.78

296

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 6.7k
MMBtu
8.9%
- Electrical $58k 656k
kWh
11.9%
- Natural Gas $7.9k -
MMBtu
-
Waste $22k
Productivity/Other $107k
TOTAL $216k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $700k 79k
MMBtu
$10.22
- Electrical $457k 5,807k
kWh
$0.089
- Natural Gas $101k 17k
MMBtu
$5.11

110

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 3.4k
MMBtu
4.3%
- Electrical $30k 330k
kWh
5.7%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.3k
Productivity/Other $42k
TOTAL $84k