ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Seafood product preparation and packaging
SIC 2+ Digits Required
3+ Characters Required for Products

44

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $660k 71k
MMBtu
$11.88
- Electrical $437k 5,209k
kWh
$0.10
- Natural Gas $92k 16k
MMBtu
$4.98

308

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 6.3k
MMBtu
8.8%
- Electrical $55k 614k
kWh
11.8%
- Natural Gas $7.5k -
MMBtu
-
Waste $20k
Productivity/Other $103k
TOTAL $205k
*May be negative reflecting an increased cost component required to save energy and costs overall

43

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $671k 72k
MMBtu
$11.93
- Electrical $443k 5,291k
kWh
$0.10
- Natural Gas $94k 16k
MMBtu
$5.10

136

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.2k
MMBtu
4.5%
- Electrical $30k 315k
kWh
5.9%
- Natural Gas $1.3k -
MMBtu
-
Waste $14k
Productivity/Other $91k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall