ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Use adjustable frequency drive or multiple speed motors on existing system
NAICS Seafood product preparation and packaging
SIC 2+ Digits Required
3+ Characters Required for Products

43

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $671k 72k
MMBtu
$11.93
- Electrical $443k 5,291k
kWh
$0.10
- Natural Gas $94k 16k
MMBtu
$5.10

304

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 6.4k
MMBtu
8.9%
- Electrical $56k 627k
kWh
11.8%
- Natural Gas $7.7k -
MMBtu
-
Waste $21k
Productivity/Other $104k
TOTAL $209k
*May be negative reflecting an increased cost component required to save energy and costs overall

43

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $671k 72k
MMBtu
$11.93
- Electrical $443k 5,291k
kWh
$0.10
- Natural Gas $94k 16k
MMBtu
$5.10

136

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.2k
MMBtu
4.5%
- Electrical $30k 315k
kWh
5.9%
- Natural Gas $1.3k -
MMBtu
-
Waste $14k
Productivity/Other $91k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall