The ITAC Statistics page displays the average assessment results for the selected criteria.
40
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $707k | 77k |
MMBtu
|
$11.73 |
- Electrical | $464k | 5,567k |
kWh
|
$0.10 |
- Natural Gas | $101k | 18k |
MMBtu
|
$4.90 |
288
Recommendations
7.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $87k | 6.7k |
MMBtu
|
8.7% |
- Electrical | $58k | 653k |
kWh
|
11.7% |
- Natural Gas | $8.1k | - |
MMBtu
|
- |
Waste | $23k | |||
Productivity/Other | $109k | |||
TOTAL | $219k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
33
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $716k | 81k |
MMBtu
|
$10.30 |
- Electrical | $469k | 5,845k |
kWh
|
$0.091 |
- Natural Gas | $106k | 18k |
MMBtu
|
$4.97 |
108
Implemented Recommendations
3.3
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $44k | 3.6k |
MMBtu
|
4.4% |
- Electrical | $32k | 348k |
kWh
|
6.0% |
- Natural Gas | $1.6k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | $45k | |||
TOTAL | $89k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |