ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Poultry processing
SIC 2+ Digits Required
3+ Characters Required for Products

45

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,671k 419k
MMBtu
$7.03
- Electrical $1,290k 25,788k
kWh
$0.056
- Natural Gas $957k 150k
MMBtu
$6.43

378

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $228k 13k
MMBtu
3.2%
- Electrical $76k 1,301k
kWh
5.0%
- Natural Gas $103k -
MMBtu
-
Waste $3.2k
Productivity/Other $29k
TOTAL $260k
*May be negative reflecting an increased cost component required to save energy and costs overall

45

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,671k 419k
MMBtu
$7.03
- Electrical $1,290k 25,788k
kWh
$0.056
- Natural Gas $957k 150k
MMBtu
$6.43

138

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 4.6k
MMBtu
1.1%
- Electrical $27k 452k
kWh
1.8%
- Natural Gas $22k -
MMBtu
-
Waste $0.9k
Productivity/Other $16k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall